Fhandy Pandey

Energy Technical Expert

Geothermal Enginer

GHG Verifier

GHG Validator

GHG Consultant

Fhandy Pandey

Energy Technical Expert

Geothermal Enginer

GHG Verifier

GHG Validator

GHG Consultant

JCM Project : Energy Saving for Air-Conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller

Energy Saving for Air-Conditioning and Process Cooling by Introducing High-efficiency
Centrifugal Chiller

The proposed JCM project aims to improve energy saving for air-conditioning and process cooling by introducing high-efficiency centrifugal chiller in a textile factory in Indonesia. The factory needs considerable electricity, and chillers consume significant amount of energy compared with the other machines in the factory. The proposed project covers a textile factory of PT. Primatexco Indonesia in Batang, Central Java province in Indonesia. The cooling requirements of the project are 500 USRt. Before the project, two existing chillers whose plate capacity is 230 USRt (centrifugal chiller) and 400 USRt (absorption chiller using steam from fossil fuels) are operated with the actual capacity of 200 USRt and 250 USRt respectively in the factory. These chillers were replaced with one high-efficiency centrifugal chiller of 500 USRt by the project.

Poject titleEnergy Saving for Air-Conditioning and Process Cooling by Introducing High-efficiency Centrifugal Chiller Ref No. ID001Energy Saving for Air-Conditioning at Textile Factory by Introducing High-efficiency Centrifugal Chiller in Batang, Central Java (Phase 2) Ref No. ID005
Name of project participants (Indonesia)PT. Primatexco Indonesia
Name of project participants (Japan)Nippon Koei Co., Ltd. (Focal Point), Ebara Refrigeration Equipment & Systems Co., Ltd.
Name of third-party entity (TPE)PT. Mutuagung Lestari
Location of projectCountry: Republic of Indonesia Region/State/Province etc: Central Java Province City/Town/Community etc: Batang Latitude, longitude:S 6°55’0″, E 109°44’53”
DurationStarting date of project operation: 01 Mar 14 The expected operational lifetime of project: 7 years
Methodology No.
Emission Reductions (tCO2e)Estimated emission reductions in each year
  • 0 (in 2013)
  • 97 (in 2014)
  • 117 (in 2015)
  • 117 (in 2016)
  • 117 (in 2017)
  • 117 (in 2018)
  • 117 (in 2019)
  • 117 (in 2020)
StatusProject registered
Public comments
  • 25 Sep 14  –  24 Oct 14